Survey has no fixed points. Therefore I've fixed 1 at (0,0,0) Removing trailing traverses... Concatenating traverses... Simplifying network... Calculating network... Calculating traverses... Calculating trailing traverses... Calculating statistics... Survey contains 3 survey stations, joined by 2 legs. There are 0 loops. Total length of survey legs = 2.00m ( 2.00m adjusted) Total plan length of survey legs = 2.00m Total vertical length of survey legs = 0.00m Vertical range = 0.00m (from 3 at 0.00m to 3 at 0.00m) North-South range = 1.00m (from 3 at 1.00m to 1 at 0.00m) East-West range = 1.00m (from 3 at 1.00m to 2 at 0.00m) 2 1-nodes. 1 2-node.