Removing trailing traverses... Concatenating traverses... Simplifying network... Calculating network... Calculating traverses... Calculating trailing traverses... Calculating statistics... Survey contains 5 survey stations, joined by 4 legs. There are 0 loops. Total length of survey legs = 4.00m ( 4.00m adjusted) Total plan length of survey legs = 4.00m Total vertical length of survey legs = 0.00m Vertical range = 0.00m (from 5 at 0.00m to 5 at 0.00m) North-South range = 1.00m (from 3 at 1.00m to 5 at 0.00m) East-West range = 1.00m (from 4 at 1.00m to 5 at 0.00m) 2 1-nodes. 3 2-nodes.