Removing trailing traverses... Concatenating traverses... Simplifying network... Calculating network... Calculating traverses... Calculating trailing traverses... Calculating statistics... Survey contains 2 survey stations, joined by 1 leg. There are 0 loops. Total length of survey legs = 10.25m ( 10.25m adjusted) Total plan length of survey legs = 10.25m Total vertical length of survey legs = 0.00m Vertical range = 0.00m (from 2 at 0.00m to 2 at 0.00m) North-South range = 10.25m (from 2 at 10.25m to 1 at 0.00m) East-West range = 0.00m (from 2 at 0.00m to 2 at 0.00m) 2 1-nodes.