Ticket #114: Winnats_Head_CaveBREAKING.2.svx

File Winnats_Head_CaveBREAKING.2.svx, 4.6 KB (added by Alastair Gott, 4 years ago)

file I broke trying to use two EOL statements within a survey.

Line 
1*Begin Winnats_Head_Cave
2
3*data normal from to tape compass clino
4
5*fix 26 413140 382820 390
6
7*entrance 26
8
9*begin ;JBs data starting in Main Chamber out to entrance MARKPIMMS
10*ref "413155    382825  390 THESE ARE THE ENT CO ORDINATES FROM HITCH N HIKE PETE WARDS ENTRANCE HEIGHT IS 404M AND APPEARS TO BE TOO HIGH IN AV"
11
12*date 1976.10.28
13*team "J.S.Beck"
14*team "K. Bentham"
15*team "NJD Butcher"
16*instrument compass "Silva"
17*instrument clino "Silva"
18*instrument Tape "Fibron"
19
201       2       5.2     53      42      ;Starts at back of main chamber
212       3       5.4     105     44
223       4       1.95    254     15
234       5       0.93    226     0
244       6       3.36    154     37
256       7       1.78    173     -18
267       8       4.65    152     58
278       9       1.89    136     37
289       10      15.19   118     -2
2910      11      2.71    111     60
3011      12      4.8     41      23
319       13      19.94   254     -16
3213      14      11.8    115     -11
3313      15      11      120     18
3413      16      4.42    300     37
3516      17      3.53    293     18
3617      18      2.24    332     2
3718      19      2.26    303     25
3819      20      1.79    262     45
3920      21      1.29    0       90
4021      21a     12.15   330     2
4121      22      9.3     276     5       ;21 is upturned slab in small chamber
4222      23      3.39    329     14
4323      24      3.51    311     35
4424      25      4       358     50
4525      26      3.69    348     46      ;26 is entrance
46*end
47
48
49*begin ;Bens extension off station 10
50
51*date 1976.11.03
52*team "J.S. Beck"
53*team "K Bentham"
54                       
5510      10a     3.1     235     19
5610      10b     3.4     267     -10
5710b     10c     2.62    227     2
5810c     10d     6.08    242     0
59*end
60
61
62*begin ;JB'S data out from bottom of fox chamber up into Main Chamber
63
64*date 1978.02.15
65*team "J.S. Beck"
66*team "D.W. Gill"
67               
68FC1     FC2     10.6    52      -12     ;JB note book states compass 252deg, but think it must mean 52
69FC2     FC3     15.3    66      4
70FC2     FC4     10.7    70      2
71FC2     FC5     8.7     105     0       ;5 is top of main big boulder at bottom of fox ch.
72FC3     FC6     15.6    87      27
73FC6     FC7     16.5    55      39
74FC7     FC8     3.1     120     29
75FC8     FC9     6.1     354     74
76FC9     FC10    2.4     84      33
77FC10    FC11    5.9     148     48
78FC11    FC12    0.5     238     80      ;JB notes "step 0.5 to 238" no clino reading. PW computer print out states 0.5 58 -80. not sure where he gets 80 from.
79;FC12   FC13    2       0       90      ;JB notes "2m vert with 5deg hade to 328 up through squeeze" PW computer print out states -5 deg which is Prob not right.
80FC12    FC13    2       328     5
81FC13    FC14    1.1     260     0
82FC14    FC15    3       220     44
83FC15    FC16    2.5     330     41
84FC16    FC17    1       116     45
85FC17    FC18    4.7     0       90
86FC18    16      7.8     308     44
87*end
88
89
90*begin ;PW's survey Down from Fox chamber, through sewer and to terminal Sump. 
91
92*date 1988.08.14
93*team "Pete Ward"
94*team "Mark Loftus"
95*team "P. Boardman"
96
97;PW applied a 7deg compass correction to all his legs
98*calibrate compass -7
99
100FC5     PW2     4.3     256     -36     ;Starts from JB's station 5 which was top of biggest boulder at bottom of Fox Chamber
101PW2     PW3     4.8     132     -56
102PW3     PW4     4.2     25      -39
103 *set EOL (5E)
104;PW4    PW5     2.8     86      -46
105PW5     PW6     2.5     184     -27
106PW6     PW7     2.8     261     -49
107PW7     PW8     0.8     269     0
108PW8     PW9     3.6     0       -90
109PW9     PW10    3.1     352     4
110PW10    PW11    2.6     0       -90
111PW11    PW12    0.7     20      -22
112PW12    PW13    2.8     76      -27
113PW13    PW14    2.4     124     15
114PW14    PW15    3       194     -55
115PW15    PW16    1.2     247     -56
116PW16    PW17    1.1     0       -90
117PW17    PW18    3.8     82      -51
118PW18    PW19    4.1     104     -28     ;shot across static sump "this is the sea"
119PW18    PW20    3.7     20      -11
120PW20    PW21    6.6     306     -8
121PW21    PW22    2.4     308     -12
122PW22    PW23    3.6     298     -21
123PW23    PW24    1.4     293     -38
124PW24    PW25    5.8     312     0       ;Through the Sewer
125PW25    PW26    1       0       90
126PW26    PW27    1.9     314     21
127PW27    PW28    2.3     311     -1
128PW28    PW29    5       305     -27
129PW29    PW30    0.8     0       -90
130PW28    PW33    5.7     71      69
131PW33    PW34    4.4     0       90
132PW34    PW35    5.6     291     54
133PW35    PW36    1.8     352     49
134PW36    PW37    4.9     358     29
135PW37    PW39    3       11      28
136PW39    PW40    4.6     20      25
137PW40    PW41    3       332     -4
138PW41    PW42    3.6     302     -6
139PW42    PW43    5.7     302     -4
140PW43    PW44    3.2     252     -27     ;PW43 is where upstream pitches go from
141PW44    PW45    2.6     316     3
142PW45    PW46    3       317     -13
143PW44    PW47    2.1     281     -15
144PW47    PW48    10      303     -65
145PW48    PW49    7.1     162     -24
146PW49    PW50    2.7     0       -90
147PW50    PW51    5.8     339     -30
148PW51    PW52    4.2     288     -39
149PW52    PW53    11.4    0       -90
150PW53    PW54    2.5     309     -36
151PW54    PW55    12.3    290     -37
152PW55    PW56    7       262     -42
153PW56    PW57    2.2     264     -49
154PW57    PW58    7       0       -90
155PW58    PW59    2.4     275     -22
156PW59    PW60    4.2     0       -90
157PW60    PW61    5       124     0
158PW61    PW62    1.2     206     -36
159PW62    PW63    4       161     -61
160PW63    PW64    3.5     164     0       ;PW63 is terminal sump^
161*set EOL (x0Ax0D)
162
163*end
164
165
166
167;Upstream Avens
168
169*begin
170;Pete wards notes only contained a series of cartesian co-ordinates for these legs.
171;The survex result looks exactly the same as Petes hand drawn legs, so happy that this is acurate.
172
173*data cartesian from to easting northing altitude
174
175PW43    US1     2       1.62    4.29
176US1     US2     -0.07   -2.09   0.52
177US2     US3     1.58    0.42    1.82
178US3     US4     0       0       4.6
179US4     US5     2.76    -2.15   1.49
180US5     US6     -4.66   4.83    0.71
181US6     US7     0       0       7.25
182US7     US8     -0.49   1.84    0.89
183US8     US9     0       0       4.45
184US9     US10    -1.46   0.31    1.55
185US10    US11    0.15    2.93    3.15
186US11    US12    -0.52   1.36    0.65
187US12    US13    -0.3    2.88    0.94
188US13    US14    -0.52   3.26    0
189US14    US15    0       0       5.9
190US15    US16    -0.85   1.53    0.03
191US16    US17    -0.68   1.14    0.9
192US17    US18    -5.82   3.63    1.84
193US18    US19    -4.03   3.38    1.61
194*end
195
196*End Winnats_Head_Cave